PROFILE | Sewage Treatment Plant Repairs
/SSM was the Engineer, Contractor, and Construction Manager in the Design-Build project for the analysis, repair, and rehabilitation of the River Park Sewage Treatment Plant.
Read MoreSSM was the Engineer, Contractor, and Construction Manager in the Design-Build project for the analysis, repair, and rehabilitation of the River Park Sewage Treatment Plant.
Read MoreSSM developed a plan to convert a chilled water plant consisting of two independent chilled water systems comprised of 2 – 600 ton chillers (N+1) and associated pumps and 2 – 250 ton chillers (N+1) and associated pumps to a single system consisting of 3 – 400 ton chillers and associated pumps.
Read MoreSSM conducted a survey and performed an energy audit of the existing facility in 2010 and suggested several no cost and low cost strategies for saving energy as well as some capital improvement project that would have an impact on energy efficiency.
Read MoreSSM prepared preliminary and final design plans and specifications for the site and utility improvements associated with the Bingaman House Recreational Center located at Lake Antietam Park, Lower Alsace Township, Berks County, Pennsylvania.
Read MoreCopyright © SSM Group, Inc. 2020. All Rights Reserved.