Water System Evaluation

CENTRAL BUCKS SCHOOL DISTRICT

Water System Evaluation and Feasibility Study

Provided a water system evaluation and feasibility study to address current water needs and provide recommendations to the District for improvements to the system and better service to the schools’ population. SSM’s engineers evaluated the existing wells, the water supply system, and the storage and distribution system for the East High School and Holicong Middle School.

 

Potable Water Tank Replacement and Maintenance Building Addition

SSM engineers provided structural, electrical, and mechanical engineering and design services for the removal and replacement of an existing 5,000 gallon potable water storage tank with two new 7,500 gallon storage tanks to be supported on new foundations, and a maintenance equipment room addition for storage of equipment.